Punjabstat.com – Revealing India Statistically
 Members Login 
IP Login My Profile    Forgot Password?
Home About Us Membership Must See Publications ContactUs
Administrative Setup
Agriculture
Banks and Financial Institutions
Civil Supplies and Consumer Affairs
Companies
Cooperatives
Crime and Law
Demographics
Economy
Education
Electoral Data
Environment and Pollution
Foreign Trade
Forest and Wildlife
Geographical Data
Health
Housing
Industries
Insurance
Labour and Workforce
Media
Meteorological Data
Mines and Minerals
Per Capita Availability
Petroleum
Power
Social and Welfare Schemes
Sports
Telecommunication
Tourism
Transport
Urban Areas
Villages
     
  Central Institute of Post-Harvest Engineering and Technology (ICAR), Punjab
  18th meeting of Sugarcane Research and Development workers of Southern Karnataka
  1st Academic Summit on Valuation and Financial Modeling on 27th – 28th Nov 2010 in Pune
  National Level Technical Workshop on Remote Sensing, GIS and GPS Application in Natural Resource Management, 9th-10th March 2010

 
Some of our Esteemed Members
 

This information is available only to registered members.
Existing users please login by providing your Username and Password below
User name:    Password:
IP Access User click
Here  for login.
Use of this web site constitutes acceptance of "Terms of Use and Disclaimer
Non-members, please check ' MemberShip for more details.
(Please Note: After login, you are require to re-click the desired table heading)
Generation
Click Here for Specimen Table  
(Sub-sections are shown in alphabetical order)
  Annual Plant Load Factor Achieved by Thermal Plants/Hydel Plants/Common Pool Project and Total Energy Generated in Punjab (1990-1991, 1997-1998 to 2008-2009)
  Installed Plant Capacity for Electricity Supply in Punjab (1990-1991 to 2008-2009)
  Source-wise Electrical Energy Availability in Punjab (1990-1991, 1997-1998 to 2008-2009)
  State-wise Power Generation in Northern India (2001-2002 to 2008-2009, April-November) 
  Installed Plant Capacity and Electricity Generated in Punjab (1970-1971, 1980-1981, 1990-1991, 1994-1995 to 2000-2001 and 2002-2003 to 2007-2008)
  State/Prime mover-wise Installed Generating Capacity (Utilities Only) in Northern India (As on 31.3.2001 to 31.03.2008)
  State-wise Gross Energy Generation (Utilities only) in Northern India (2000-2001 to 2007-2008)
  State-wise Gross Energy Generation (Utilities only) in Northern India (2000-2001 to 2007-2008)
  Growth of Power Generation in Punjab (2000-2001 to 2005-2006)
  Growth of Power Installed Capacity in Punjab (2000-2001 to 2005-2006)
  Status of Power in Punjab (2002-2003 to 2005-2006)
  Power House/Source-wise Energy Generation and Consumption by Punjab State Electricity Board (2004-2005)
  Sub-Station-wise Power Capacity Commissioned in Punjab (2004-2005)
  Generation of Electricity in Punjab (As on 30-09-2004)
  Performance of Thermal Plants (Percentage Load Factor) in Punjab (1997-1998 to 2003-2004)
  Power Generating Capacity in Punjab (As on 31.07.2004)
  Project-wise Installed Capacity and Generation of Power in Punjab (30.09.2004)
  Achievement of Guru Nanak Dev Thermal Plant of Bathinda in Punjab (1998-1999 to 2002-2003)
  Details of Identified Small Hydel Sites up to 25 MW Capacity in Punjab (2001-02 & 2002-03)
  Electricity Generation and Consumption by Industries having Captive Power Plants (1 MW and Above) in Punjab (2002-2003) - Part II
  Performance of Guru Gobind Singh Super Thermal Plant of Ropar in Punjab (1998-1999 to 2002-2003)
  Performance of Guru Hargobind Thermal Plant of Lehra Mohabbat in Punjab (1998-1999 to 2002-2003)
  Sources-wise Energy Generated by Own Power Houses and Common Pool Projects in Punjab (2002-2003)
  Details of SHP Projects Set up/ongoing upto 23 MW Station Capacity in Punjab (During 2001-2002)
  Electricity Generation in Punjab (1992-1993 to 2001-2002)
  Generating Capacity in Punjab (As on 31.03.2002)
  Status of Hydro Electric Development -Conventional in Punjab (2001-02)
  Thermal Power Generation in Punjab (2001-02)
  Energy Generation & Percentage Ratio by Central Sector Power Stations in Punjab (April 2000-January 2001)
  Energy Requirement and Peak Load at Power Station Busbars in Punjab (During 2001-02, Upto 31.10.2001)
  Hydro Schemes under Construction in Punjab (As on 22.2.2001)
  Potential of Hydro-Electric Projects in Punjab (November 2001)
  Power House-wise Installed and Firm Capacity of Hydro Thermal and Diesel Plants in Punjab (As on 31.03.1976, 31.03.1998 to 31.03.2001)
  Power House-wise Power Generated by Thermal and Diesel Plants and Quantity of Fuel Consumed in Punjab (1998-1999 to 2000-2001)
  Power House-wise Power Generation in Punjab (1975-1976, 1997-1998 to 2000-2001)
  Status of Hydro Electric Potential Development in Punjab (As on 01.11.2001)
  Status of Hydro-Electric Potential Development in Punjab (As on 1.2.2001)
  Thermal Power Generated by State Electricity Board of Punjab (1999-2000 and 2000-2001)
  Utilisation Capacity of Electricity Generating Plants in Punjab (1975-1976, 1997-1998 to 2000-2001)
  Average Plant Load Factor (%) of Power Plants in Punjab (During 1999-2000)
  Generation of Electricity and Plant Load Factor of Thermal and Nuclear Plants (Utilities) in Punjab (1997-1998 to 1999-2000)
  Installed Capacity of Utilities in MW in Punjab ({As on 31.12.2000} {Provisional})
  Installed Generating Capacity (Utilities) in Punjab (As on 31.03.2000)
  Physical and Financial Performance of Hydro Power Generation Projects in Punjab (During 1999-2000)
  Power Capacity added under various Non-Conventional Energy Programmes in Punjab (During 1997-98 to 1999-2000)
  Installed Capacity in Punjab (1998-1999)
  Installed Generating Capacity (Utilities) in Punjab ({As on 31st January, 1999} {Provisional})
  Physical and Financial Performance of Hydro Power Generation Projects in Punjab (During 1998-99)
  Power Generation in Punjab (1997-1998)
  Power House-wise Power Generated by Thermal and Diesel Plants and Quantity of Fuel Consumed in Punjab (1975-1976 and 1997-1998)
  Energy Generation [Net], Inter System Transfer of Energy Utilisation of Energy and System Losses In Punjab (During 1996-97) - Part I
  Gross Energy Generation (Utilities Only) in Punjab (1995-1996 and 1996-1997)
  Gross Energy Generation (Utilities Only) Ownerwise in Punjab (1995-96 & 1996-97)
  Gross Energy Generation of Diesel (Utilities Only) in Punjab (1995-96 & 1996-97)
  Gross Energy Generation of Gas (Utilities Only) in Punjab (1995-96 & 1996-97)
  Gross Energy Generation of Hydro (Utilities Only) in Punjab (1995-96 & 1996-97)
  Gross Energy Generation of Nuclear (Utilities Only) in Punjab (1995-96 & 1996-97)
  Gross Energy Generation of Steam (Utilities Only) in Punjab (1995-96 & 1996-97)
  Installed Capacity of Common Pool Projects in Punjab ( As on 31.3.97)
  Installed Capacity/Share from Hydro and Thermal Projects in Punjab (As on 31.3.97)
  Installed Generating Capacity of Selected Industries (Having Installed Plant Capacity of 1 MW & Above) in Punjab (As on 31st March, 1997) - Part I
  Installed Generating Capacity of Selected Industries (Having Installed Plant Capacity of 1 MW & Above) in Punjab (As on 31st March, 1997) - Part II
  Installed Generating Capacity of Selected Industries (Having Installed Plant Capacity of 1 MW & Above) in Punjab (As on 31st March, 1997) - Part III
  Installed Generating Capacity of Selected Industries (Having Installed Plant Capacity of 1 MW & Above) in Punjab (As on 31st March, 1997) - Part IV
  Installed Generating Capacity of Selected Industries (Having Installed Plant Capacity of 1 MW & Above) in Punjab (As on 31st March, 1997) - Part V
  Installed Generating Capacity of Selected Industries (Having Installed Plant Capacity of 1 MW & Above) in Punjab (As on 31st March, 1997) - Part VI
  Electricity Generation and Consumption by Industries having Captive Power Plants (1 MW and Above) in Punjab (2002-2003) - Part I
  Electricity-Installed Capacity, Generation and Consumption (Utilities Only) in Punjab (1999-2000) - Part I
  Electricity-Installed Capacity, Generation and Consumption (Utilities Only) in Punjab (1999-2000) - Part II
  Estimated Electricity Generated from Non-conventional Energy Projects in Punjab (2002-2003)
  Generation (Net), Inter System Transfer/Utilisation of Energy and System Losses in Punjab (2002-2003) - Part I
  Generation (Net), Inter System Transfer/Utilisation of Energy and System Losses in Punjab (2002-2003) - Part II
  Gross Energy Generation of Captive Power Plants (1 MW and Above) in Punjab (2002-2003) - Part I
  Gross Energy Generation of Captive Power Plants (1 MW and Above) in Punjab (2002-2003) - Part II
  Gross Energy Generation of Captive Power Plants (1 MW and Above) in Punjab (2002-2003) - Part III
  Installed Capacity of Captive Power Plants (1 MW and Above) in Punjab (As on 31.3.2003)
  Installed Energy Generating Capacity of Captive Power Plants (1 MW and Above) in Punjab (As on 31st March, 2003) - Part II
  Installed Energy Generating Capacity of Captive Power Plants (1 MW and Above) in Punjab (As on 31st March, 2003) - Part III
  Installed Generating Capacity [Utilities Only] in Punjab (As on 31st March, 1999) - Part II
  Installed Power Generating Capacity of Selected Industries (1 MW and Above) in Punjab (As on 31.03.2001) - Part I
  Installed Power Generating Capacity of Selected Industries (1 MW and Above) in Punjab (As on 31.03.2001) - Part II
  Region/Consumption of Fossil Fuels for Electricity Generation for Thermal Stations (by kind of Fuels) in Punjab (2000-2001) - Part I
  Region/Consumption of Fossil Fuels for Electricity Generation for Thermal Stations (by kind of Fuels) in Punjab (2000-2001) - Part II
  Region/Gross Generation, Net Generation and Auxiliary Consumption of Hydro Energy (Utilities Only) in Punjab (2000-2001)
  Region/Gross Generation, Net Generation and Auxiliary Consumption of Nuclear Energy (Utilities Only) in Punjab (2000-2001)
  Region/Gross Generation, Net Generation and Auxiliary Consumption of Steam Energy (Utilities Only) in Punjab (2000-2001)
  Region/Gross/Net Generation and Auxiliary Consumption of Diesel and Wind Energy (Utilities Only) in Punjab (2002-2003)
  Region/Gross/Net Generation and Auxiliary Consumption of Gas Energy (Utilities Only) in Punjab (2002-2003)
  Region/Gross/Net Generation and Auxiliary Consumption of Hydro Energy (Utilities Only) in Punjab (2002-2003)
  Region/Gross/Net Generation and Auxiliary Consumption of Nuclear Energy (Utilities Only) in Punjab (2002-2003)
  Region/Gross/Net Generation and Auxiliary Consumption of Steam Energy (Utilities Only) in Punjab (2002-2003)
  Region/Gross/Net Generation and Auxiliary Consumption of Total Energy (Utilities Only) in Punjab (2002-2003)
  Region/Installed Capacity of Power Utilities in Punjab (As on 31st March, 2001)
  Region/Plant Load Factor of Thermal/Nuclear Power Stations in Punjab (2002-2003)
  Selected Thermal Power Units Identified for Renovation and Modernisation in Punjab (10th Plan)
 
 
Close(X)

 
 India  
 World  
              (as of now)
 
 











    |About Us |Membership |Must See |Advertise |Contact Us | Terms of Use and Disclaimer | Site Map | FAQs | Feedback | Best view |
| Copyright © : Datanet India Pvt. Ltd. All rights reserved |    District of India